Risk Assessment Survey for TBBM Siumbatu Development Plan

Muhammad Badwi Majid

6/11/2025

Survei Penilaian Risiko Rencana Pembangunan TBBM Siumbatu
Survei Penilaian Risiko Rencana Pembangunan TBBM Siumbatu

RISK ASSESSMENT SURVEY FOR TBBM SIUMBATU DEVELOPMENT PLAN

Siumbatu, 11 June 2025

PT AAKP ANEKA USAHA RAYA - Following its appointment as EPCI contractor for the Siumbatu Fuel Terminal (TBBM) Project, PT AAKP Aneka Usaha Raya conducted a risk assessment survey for the planned construction of the Fuel Terminal (TBBM). The risk assessment survey was conducted from 31 May to 20 June 2025.

The purpose of this survey is to serve as a guideline for the Project Owner and PT AAKP Aneka Usaha Raya in developing mitigation measures for risks identified in the field. Furthermore, PT AAKP Aneka Usaha Raya will conduct an Open Tender to appoint subcontractors to provide risk analysis services based on the Development Plan Document prepared by AAKP. This is done as a step in implementing the four eyes principle of existing risk mitigation.

Writer : Muhammad Badwi Majid