Survei Lokasi Rencana Pembangunan Anjungan Lepas Pantai
Survei Lokasi Rencana Pembangunan Anjungan Lepas Pantai

RISK ASSESSMENT SURVEY FOR TBBM SIUMBATU DEVELOPMENT PLAN

Bintuni, 28 November 2025

PT AAKP ANEKA USAHA RAYA - BP (British Petroleum)/BP Berau Ltd. through the Contractor Consortium PT Saipem Indonesia - PT Meindo Elang Indah appointed PT AAKP Aneka Usaha Raya as a Permit Agency Subcontractor. This appointment was made in framework of Offshore Platform Development Plan (UBA-UBB-EGR), Pipes, and Subsea Cables in Ubadari Compression Carbon Capture (UCC)/Ubadari Gas Field, Utilizing Carbon Capture and Storage (CCUS) for Enhanced Gas Recovery (EGR) Project - Tangguh LNG Train 3 Work Package.

PT AAKP Aneka Usaha Raya as Permit Agency for the project has conductedSite Survey together with Integrated Technical Team of the Directorate General of Sea Transportation, Ministry of Transportation Republic of Indonesia. This activity was carried out as a requirement to obtain Permit Izin Membangun Offshore Platforms, Pipes, and Submarine Cables. This activity is also form of verification of development plan data that has been previously submitted to Ministry of Maritime and Fisheries Affairs with Ministry of Transportation. The Site Survey activity was carried out in Berau Bay and Bintuni Bay, West Papua Province, which are still within Working Area of ​ Cooperation Contract Contractor (KKKS) BP Berau Ltd. with the Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas). The activity was carried out from 25 - 28 November 2025.

Writer : Angelia Khairunnisa